Make three proposals answer the same questions.
Use one drawing, product schedule and scope for all three firms. Record the answer, its document reference and any unresolved item. This is an original planning worksheet; it does not rate a firm, establish a construction specification or replace the selected products’ instructions and project-specific review.
Your notes stay in this tab and are not saved automatically. Download your notes before closing or refreshing. Printing includes the selected area; downloaded notes include all six areas.
Use short project references. Keep passwords, recovery codes and other sensitive access details outside these notes.
View or copy prepared notes
Kitchen — compare like-for-like scope
Can the same room drawing explain cabinetry, fabricated surfaces, water interfaces and service access?
Try this comparison
If one offer says “quartz included” and another names seams, cut-outs and an end panel, first ask the short offer to price those same items. Do not interpret the headline prices as equal scope.
On narrow screens, scroll the comparison horizontally. Each cell records the firm’s answer and its evidence, not a DLG score.
| Decision to resolve | Offer A | Offer B | Offer C |
|---|---|---|---|
| Cabinet packageBodies/fronts/hardware, fillers, end panels and the actual support/fixing responsibility. | |||
| Worktop quantities and fabricationMeasured-area convention, seams, exposed edges, cut-outs, templating and installation. A material name is not a fabrication scope. | |||
| Sink and backsplash junctionsSelected sink support, cut edge, worktop/wall junction, material compatibility and accessible shut-offs/waste connections. | |||
| Appliances and ventilationExact models, openings, connection responsibilities and the proposed hood air route. | |||
| Scope and exclusionsIdentify removal, protection, reinstatement and any work outside the quoted package. | |||
| Allowances and changesRecord what is fixed, provisional or excluded, and what evidence is needed before a change is agreed. | |||
| Sequence and responsibilityName the responsible party and the agreed review point before work is covered or fabrication begins. | |||
| Completion and handoverList the agreed checks, remaining work, exact product records, care instructions and access information. |
Bathroom — compare like-for-like scope
Does the offer describe the complete selected water-control assembly and its junctions before tile is installed?
Try this comparison
“Tile and waterproofing” leaves the drain interface and review stage unanswered. Request the actual selected detail and the responsible installer’s evidence rather than filling the gap with an assumption.
On narrow screens, scroll the comparison horizontally. Each cell records the firm’s answer and its evidence, not a DLG score.
| Decision to resolve | Offer A | Offer B | Offer C |
|---|---|---|---|
| Supporting constructionExisting conditions, preparation and readiness for the selected assembly; identify work still requiring investigation. | |||
| Water-control systemExact selected system and applicable detail references, including corners, penetrations, changes of plane and drain connection. | |||
| Tile, joints and fittingsFinish/location, layout, edge profiles, movement details and the limits of the finish contractor’s scope. | |||
| Review before concealmentWho records the selected system, which checks/tests are specified, when they occur and who accepts the record before covering. | |||
| Scope and exclusionsIdentify removal, protection, reinstatement and any work outside the quoted package. | |||
| Allowances and changesRecord what is fixed, provisional or excluded, and what evidence is needed before a change is agreed. | |||
| Sequence and responsibilityName the responsible party and the agreed review point before work is covered or fabrication begins. | |||
| Completion and handoverList the agreed checks, remaining work, exact product records, care instructions and access information. |
Floors — compare like-for-like scope
Can every offer explain the supporting surface, selected floor system and doorway transitions on the same room plan?
Try this comparison
An area-based rate can exclude leveling, doorway profiles or removal. Place those items beside each proposal before calculating a total; do not assume a low area rate covers them.
On narrow screens, scroll the comparison horizontally. Each cell records the firm’s answer and its evidence, not a DLG score.
| Decision to resolve | Offer A | Offer B | Offer C |
|---|---|---|---|
| Existing floor and preparationRemoval/retention, surface condition, repairs and the evidence supporting readiness for the chosen product. | |||
| Moisture and system compatibilityNamed product requirements, measurement method/record, underlay or adhesive selection and responsibility for acceptance. | |||
| Quantities and layoutNet area, package rounding, pattern/cutting allowance, trims and spare stock; identify each convention separately. | |||
| Doorways, movement and heatingTransition heights/profiles, movement arrangement, fixed furniture and the selected system’s heating compatibility where relevant. | |||
| Scope and exclusionsIdentify removal, protection, reinstatement and any work outside the quoted package. | |||
| Allowances and changesRecord what is fixed, provisional or excluded, and what evidence is needed before a change is agreed. | |||
| Sequence and responsibilityName the responsible party and the agreed review point before work is covered or fabrication begins. | |||
| Completion and handoverList the agreed checks, remaining work, exact product records, care instructions and access information. |
Adding a heat pump? Record heating-load and performance inputs, service/backup limits, scheduling, auxiliary heat and HVAC/solar interface responsibilities beside the relevant rows. Read the solar + heat pump integration guide.
Solar & Storage — compare like-for-like scope
Do the offers answer the same generation, operating and backup brief, using the same household demand assumptions?
Try this comparison
An offer saying “battery included” and one naming backed-up circuits, usable energy and output limits do not yet describe the same service. Ask the first firm to document those boundaries before comparing the totals. Neither description alone proves performance.
Scroll the comparison horizontally on narrow screens. Record the answer and evidence reference, not a score.
| Decision to resolve | Offer A | Offer B | Offer C |
|---|---|---|---|
| Household objective and demandRecord the agreed annual and hourly demand basis, planned new loads, generation objective and the specific outage scenario. Ask which source files and dates each firm used. | |||
| Roof, layout and building interfacesRequest the actual roof-plane layout, shading review, mounting and roof-junction details, condition/structural review responsibilities, cable route and reinstatement scope. | |||
| Production model and its boundariesIdentify weather/location, orientation, tilt, shading, DC panel capacity, inverter AC limit, losses and the delivered-energy boundary. Ask for monthly output and an explanation of hourly assumptions. | |||
| Battery and outage operationName the actual equipment, usable-energy and power basis, reserve setting, selected circuits and automatic/manual switching arrangement. Ask what can operate together and which recharge/outage demonstrations are included. | |||
| Whole installed scope and exclusionsSeparate equipment, mounting, electrical/protection work, metering, roof repairs, approvals coordination, access and reinstatement. Identify excluded work, allowances and who obtains each required project-specific approval. | |||
| Price and bill-comparison assumptionsSeparate cash equipment/installation scope, financing terms if offered, tariff/export assumptions, recurring fees and maintenance. Record source dates and ownership responsibilities; do not treat a sales saving or payback claim as verified. | |||
| Commissioning and operating evidenceList the proposed inspection/approval records, commissioning report, monitoring access, operating demonstration and outstanding issues. Ask who confirms readiness for the actual approved operating scope. | |||
| Owner handover and serviceRequest as-built layout, equipment identification, warranties, settings, safe operating instructions, support contacts and owner access. Record the maintenance responsibility, service exclusions and any ownership-transfer steps. |
Small Wind — compare like-for-like scope
Do the offers use the same parcel, rotor height, wind-resource evidence and delivered-energy boundary?
Try this comparison
A rated-power label and an annual-energy estimate answer different questions. Ask each firm for the site wind-speed distribution, matching power curve and loss/availability assumptions, then identify which inputs are measured, modelled or still unknown. Do not rank the offers by the label alone.
Scroll the comparison horizontally on narrow screens. Record the answer and evidence reference, not a score.
| Decision to resolve | Offer A | Offer B | Offer C |
|---|---|---|---|
| Parcel and resource evidenceIdentify the parcel, surrounding obstacles, proposed hub height, observation/model source, period and uncertainty. Ask which seasonal and height adjustments were made and which site evidence remains missing. | |||
| Tower or building scopeState whether the proposal uses a freestanding tower or building support. Request the relevant foundation/structural assessment, access and lifting plan, cable route, property constraints and responsible designer. | |||
| Reproducible energy calculationRequest the exact turbine/power curve, wind-speed bins and hours, electrical boundary, losses and availability assumptions. Ask for seasonal output and whether downtime timing affects the estimate; no fabricated “site measurement”. | |||
| Control, shutdown and electricity useDescribe the proposed controller/inverter, electrical interface, normal operation, shutdown/service arrangements and any storage. Ask what happens during the specific outage scenario; do not infer backup from the presence of a turbine. | |||
| Project-specific permissions and evidenceList the relevant authority, utility and property/association enquiries, required submissions identified for this parcel, responsibility and status. Record unresolved height, sound, setback or operating conditions without assuming a universal rule. | |||
| Installed and lifecycle scopeSeparate turbine, support/foundation, electrical works, lifting, studies and approvals, service access, maintenance, replacements and removal. Ask for the time horizon and assumptions behind cost-per-energy claims. | |||
| Commissioning and service demonstrationRequest equipment/setting records, the agreed operating and shutdown checks, approval evidence applicable to the installation, monitoring access and outstanding-issue list. Ask who performs and documents the review. | |||
| Ongoing responsibility and exit planRecord inspection/service duties, qualified support contacts, access/lifting arrangements, warranty boundaries, spare-part assumptions and ownership transfer or decommissioning responsibility. |
Smart Homes — compare like-for-like scope
Can each firm demonstrate the same room functions, dependency behaviour and owner handover, rather than quote a similar device count?
Try this comparison
“Smart lighting included” is not yet a room schedule. Ask all three firms to describe the same manual switch behaviour, automation, local/remote dependencies, outage response and owner access. Record how each claim will be demonstrated, including what the proposal excludes.
Scroll the comparison horizontally on narrow screens. Record the answer and evidence reference, not a score.
| Decision to resolve | Offer A | Offer B | Offer C |
|---|---|---|---|
| Room functions and manual operationList each agreed room/routine, normal behaviour and manual control. Distinguish a desired experience from a product list; record excluded rooms, devices and future work. | |||
| Devices, networking and control rolesRequest actual product/model/firmware references, controllers, bridges/border routers where applicable, power supplies, network coverage and wired infrastructure. Ask for evidence that the selected combination supports the agreed functions. | |||
| Local, cloud and remote dependenciesFor each important function, identify controller, network, internet, account and service dependencies. Ask which functions remain local and what evidence supports the claim for this actual configuration. | |||
| Failure and recovery demonstrationsAgree demonstrations for internet loss, controller failure, power loss and service/account unavailability as relevant. Include manual operation and recovery. Ask the provider to use approved safe procedures; do not disconnect mains or safety-critical equipment yourself. | |||
| UPS load and backup boundaryList devices that must stay powered, measured or explicitly assumed input loads, usable/delivered energy basis, power limit and runtime method. Separate keeping controls alive from supplying household appliances or restoring upstream internet. | |||
| Accounts, privacy and contractor accessIdentify the owner administrator, service/account duties, permissions and access-expiry plan. Reference a protected owner-controlled location for credentials; never write passwords, recovery codes or camera access links into this worksheet. | |||
| Installation, fees and support scopeSeparate equipment, cabling/building work, configuration, subscriptions, support visits, update responsibility and change requests. Ask which promised support periods are documented and what happens if a service ends. | |||
| Acceptance, records and transferRequest the function/dependency demonstration record, equipment inventory, configuration backup and restore evidence, operating instructions, support contacts and removal of contractor access. Record ownership-transfer and account-reset responsibilities. |
Turn missing answers into next steps.
Compare prices only after identifying what each includes. A detailed answer still needs suitable workmanship references and applicable credential/insurance checks. Record the actual selection separately; this worksheet never makes the decision for you.