LOCATION. ROOF. ENERGY.
Read the sun.
Understand the system.
Explore how place, orientation and roof layout change a home's solar potential. Build a scenario, then read the assumptions behind it.
View the current result ↓YOUR SOLAR SCENARIO
Included referenceFairfax County, Virginia
Inputs changed. Calculate to update production; displayed production belongs to the previous scenario.
A year, month by month
Follow the solar day
Monthly-mean daily profile from a typical meteorological year. It is not the forecast for the illustrated date.
What if plane A faced another direction?
Same location, tilt, panel count and model assumptions; plane B stays fixed.
Space, storage and budget
Selected-load battery scenario
Energy arithmetic only, initially full, no solar recharge. Verify continuous/surge power, product usable-energy definition and actual loads. Do not count conversion losses twice if already included in the product rating.
Installed quote / budget inputs · USD
Gross user-entered budget; no automatic incentive, finance or payback assumption. Standard wiring may already be in an installed quote. Reconcile shared inverters/controls to avoid double counting. Roof renewal, structural repairs and service upgrades need explicit scope.
Evidence and next steps
Weather cell, model inputs and scope
Astronomical sun path uses approximate NOAA geometry for the 21st of the selected month in 2026, at the model's local standard time. The production profile uses TMY data from multiple source years. No daylight-saving conversion, tree/building shade survey, structural check, permit approval or electrical design is implied.
Approvals and installer questions
Confirm the actual city/county authority, ownership/shared-roof permission, structural suitability, building/electrical/storage requirements and utility connection approval. Retain the approved drawings, inspection records and permission to operate.
Solar & Storage — full reading guide
DLG GROUP · INSIGHTS / SOLAR & HOME PERFORMANCE
Plan solar and storage around the home
A useful solar proposal explains more than how many panels fit on a roof. It connects the building, electricity use, expected production, equipment, ownership and the behaviour you want during a power outage.
This guide brings together U.S. public energy resources and a manufacturer mounting example. It is a planning guide for homeowners and property readers, not an electrical design or an estimate for a particular house.
1. Begin with the outcome you need
Write down the purpose before comparing equipment. Reducing purchased electricity, shifting energy to a different time and keeping selected loads running during an outage are different objectives.
| Objective | Information to gather | Question for the proposal |
|---|---|---|
| Reduce electricity purchases | Bills and, where available, interval consumption | How does estimated production align with when the home uses energy? |
| Shift energy use | Consumption timing and the actual tariff | Which control strategy is proposed, and on what assumptions? |
| Support selected loads during outages | The loads, their demand and required operating period | Which loads are actually backed up, and what limits apply? |
| Prepare for future changes | Planned EV charging, heat pump or other major changes | What is included now, and what would need alteration later? |
These are DLG scope questions. DOE’s consumer process guide similarly points to reviewing bills and future changes when considering electricity needs. [S01] A future-ready label is more useful when the proposal states exactly what can be added and what would need replacement.
2. Separate capacity, production and consumption
Power describes a rate. Energy describes an amount over time. EIA distinguishes storage power capacity from energy capacity using watts and watt-hours respectively. [S02]
In a proposal, keep these items separate:
- PV capacity in kW: a rating for the array under stated conditions, often presented as DC capacity.
- Estimated production in kWh: energy the model expects over a period, such as a month or year.
- Home consumption in kWh: energy used during the period being examined.
- Battery usable energy in kWh: the usable amount stated for the selected product and operating conditions.
- Battery output in kW: the power the system can supply under its specified conditions.
A panel rating is not a promise of constant output. An annual production figure does not establish how much power is available at a particular evening or during a cloudy outage.
A simple battery example
If an illustrative system has 6 kWh available to the selected loads and those loads draw a constant 0.5 kW, the ideal arithmetic is 6 ÷ 0.5 = 12 hours. This is a teaching example, not a runtime forecast. Real assessment needs available charge, reserve settings, losses, changing demand, power limits and any solar contribution. DOE notes that storing and recovering energy involves losses. [S03]
3. Read the roof before the panel layout
DOE’s consumer guide includes roof condition and suitability in the planning process. [S01] Ask for the roof type, age/condition record, structural review where required and coordination with any planned roof work.
The drawing should identify the proposed array, relevant roof features, access constraints and cable/service routes. Ask who confirms applicable layout and access requirements for the actual jurisdiction. Aerial imagery is a starting point, not a substitute for the assessment.
| Roof or mounting context | What to establish | Detail to request |
|---|---|---|
| Standing-seam metal roof | Exact seam profile, roof system and proposed attachment | Product compatibility, load path and roof-maker requirements |
| Shingle or tile roof | Roof condition and selected attachment arrangement | The actual mounting and weatherproofing detail |
| Low-slope or membrane roof | Roof assembly and proposed support strategy | How the chosen system addresses loading, water management and maintenance access |
| Ground or carport mounting | Supporting structure, site and route to the building | Site/structural arrangement and the scope of associated work |
This table identifies review subjects. It does not approve one fastening or waterproofing method for every material.
4. Follow the load path and the water-management detail
S-5!’s mounting guidance explains that attachment loads pass through the metal roof panels and their attachment into the building. It also calls for verification of the roof and structure rather than treating clamp strength as the entire assessment. [S04]
Closer look: a standing-seam mounting concept
The image introduces a question, not a mounting recipe: which tested attachment matches the exact roof profile, and how are loads transferred to the structure? Obtain the selected product and roof-system details, including any weatherproofing, movement and warranty conditions.
Ask the roof and solar team to coordinate the attachment, roof movement, water management, cable routing and future access. Keep the responsibilities in writing. Do not infer load capacity, fastener torque or a leak-free installation from a visual sample.
5. Understand the system roles
DOE explains that PV produces direct current and an inverter converts it to alternating current for relevant uses. Inverters may also perform monitoring and control functions. [S05]
| Component or function | What to confirm |
|---|---|
| PV modules | Exact model, ratings and layout |
| Inverter/power conversion | Exact model, compatibility and operating functions |
| Battery, if included | Usable energy, output, limits and compatible equipment |
| Controls and monitoring | Operating modes, reserve settings, communications and owner access |
| Connection and protection | The documented arrangement, approvals and relevant inspections |
Ask for a system description that shows how the selected products work together. A battery-ready inverter, an app screenshot or a hybrid label does not explain every function included in the actual proposal.
6. Compare estimated generation with the demand profile
DOE notes that solar output changes with time, season, weather, shadows and other conditions. Storage can help make energy available at a different time from production. [S03]
Request the assumptions behind an estimate: location/weather data, orientation, tilt, system size, shading and losses, together with the model and date. PVWatts provides estimates of grid-connected PV production, and its own cautions explain that results depend on inputs and modelling assumptions. [S06]
An annual total is a useful summary. Also ask for monthly output and, where it informs the decision, a comparison with interval consumption. Distinguish directly used generation, grid imports, exports and any battery charging/discharging in the proposed analysis. This article does not calculate a yield for the concept house shown above.
Useful question: Which assumptions would change most if a nearby tree grows, a roof slope differs from the model or evening consumption increases?
7. Define what happens when the grid fails
DOE explains that typical grid-dependent solar systems switch off when the grid goes down. Outage operation requires a system designed for that purpose; appropriately configured conversion, storage and control functions matter. [S07] Solar on the roof alone is not a backup guarantee.
Use a written backup-load schedule. Identify what is included, what is excluded and which loads may need to be managed. Ask separately about continuous demand, starting demand, available charge, reserve settings, solar recharging and behaviour after the battery is depleted.
DOE describes advanced inverter functions as enabling solar-plus-storage operation without grid support when the system is designed to do so. [S05] Request demonstration of the promised behaviour during commissioning, together with the owner instructions. Do not infer whole-home backup from a battery’s energy-capacity number.
8. Review the battery as part of the building
Once a battery product is selected, ask the design team to confirm its location and the installation requirements for the actual equipment and jurisdiction. Record access, environmental limits, associated equipment and the responsible installer. This guide does not prescribe a clearance, fire-resistance assembly or battery location.
| Decision | Evidence to request |
|---|---|
| Operating objective | Intended mode: daily use, tariff shifting, backup reserve or a documented combination |
| Capacity and output | Exact usable-energy and power specifications, with relevant limits |
| Building integration | Approved equipment arrangement and installation requirements |
| Future expansion | Permitted additions, compatibility and scope/cost assumptions |
| Ownership and support | Warranty terms, monitoring access and the service contact |
Keep the battery, inverter, controls and backed-up circuits in the same project conversation. Adding storage later can be a separate scope, not an automatic consequence of having panels installed.
9. Read the commercial assumptions separately
DOE’s homeowner guide links potential savings to electricity use, system production, ownership arrangements, utility rates and compensation for exports. [S08] A production estimate alone does not establish a bill reduction.
Ask the proposal to identify the applicable tariff and export arrangement, the assumptions behind bill calculations and all payments associated with the chosen ownership model. Request a clear distinction between equipment price, installation, financing, subscriptions and ongoing service charges.
Incentives, tax treatment and utility rules need current, project-specific verification. No tax-credit percentage, tariff, payback period or property-value premium is quoted here. Those changing figures should be examined in a separate dated analysis for the actual address and owner.
10. Use review points from survey to handover
DOE’s consumer process guide identifies assessment, design-related decisions, permits and inspections as parts of going solar. [S01] Use the framework below to agree responsibilities and evidence rather than assuming panel installation is the final step.
| Stage | Record or agree | Review point |
|---|---|---|
| Building and demand survey | Roof, consumption and future changes | Confirm the objective and unresolved conditions |
| Coordinated proposal | Layout, equipment, roof details, production and operating assumptions | Compare proposals on the same scope |
| Approvals | Required applications, inspections and connection responsibilities | Identify who obtains and records them |
| Installation | Actual equipment and agreed installation records | Record changes before they become hidden assumptions |
| Commissioning | Monitoring, protection/control functions and any promised outage operation | Demonstrate the included modes |
| Handover | Manuals, warranties, ownership documents and owner account access | Agree service responsibilities and open items |
Do not operate a system on the assumption that physical completion equals every required permission or approval. Ask the installer to identify the applicable steps for that installation.
11. Make monitoring and maintenance usable
Record the installed equipment and ask how the owner will see production, faults and operating status. Agree which alerts need attention and whom to contact. Cleaning and inspection should follow the selected equipment and roof requirements; a generic annual-cleaning promise is not a complete maintenance plan.
For a house already fitted with solar, DOE advises reviewing system age, installer information, warranties, production records and ownership arrangements. [S09] Request the relevant records rather than judging the asset only from a roof photograph.
Questions to take to the installer
- Which household objective is this proposal designed to meet?
- What roof assessment and mounting detail support the layout?
- Which model inputs underpin the production estimate?
- How do the modules, inverter, battery and controls work together?
- What is the exact outage scope, if included?
- Which approvals and commissioning records will be provided?
- What charges, ownership terms and ongoing responsibilities apply?
- How will access, monitoring and support be handed over?
12. Worked example: a home using 900 kWh per month
Location frame: Fairfax County, Virginia, USA. This is a DLG teaching scenario for an existing detached home, not a surveyed property, a national household average or an installer quotation. The house remains grid-connected. Dominion’s process below applies only if Dominion is the actual electricity supplier. Local rules elsewhere must be researched separately.
What does “how many kW does a home use?” mean?
Start with 12 months of bills in kWh. In this example, 900 kWh/month × 12 = 10,800 kWh/year, or approximately 29.6 kWh/day over 365 days. Dividing by 8,760 hours gives an average demand of 1.23 kW. This does not mean the home only needs a 1.23 kW inverter: simultaneous heating, cooking, water heating or EV charging can require much more. Use interval data and a load assessment to establish actual peaks and starting loads.
| Planning item | Illustrative selection or calculation | Meaning and limitation |
|---|---|---|
| Annual consumption | 10,800 kWh | Assumed bill total; replace with the property’s records |
| PV modules | 20 × 450 W | 9.0 kWp DC; the module rating is not constant output |
| Module face area | Assume 1.80 × 1.15 m each; 20 × 2.07 = 41.4 m² | Assumed dimensions, not a selected product datasheet |
| Roof planning allowance | Approximately 50–60 m² of suitable roof | DLG space allowance for this example; not a code setback or a guaranteed fit. Geometry, access, obstructions and shading may require more |
| Inverter | Quote a compatible roughly 7.6–9 kW AC class solution | Illustrative coordination range; exact DC/AC ratio, service connection and backup output require design |
| Storage | One 13.5 kWh-class battery system | For the runtime exercise below, assume 13.5 kWh usable before reserve; verify the selected product’s usable rating |
| Backup scope | Selected essential circuits | Whole-home heating, cooking and vehicle charging are not assumed included |
How much might the panels generate?
The calculation is annual energy = array kWp × annual specific yield. Use the following sensitivity exercise to understand the sizing. The yields are deliberately chosen assumptions, not a Fairfax PVWatts result or a predicted production range.
| Assumed net AC yield per kWp per year | 9 kWp annual energy | Ratio to 10,800 kWh consumption |
|---|---|---|
| 1,000 kWh/kWp | 9,000 kWh | 83% |
| 1,200 kWh/kWp | 10,800 kWh | 100% |
| 1,400 kWh/kWp | 12,600 kWh | 117% |
“100% annually” does not mean continuous self-sufficiency or a zero bill. Night-time imports, exports, seasonal differences, tariff rules and battery losses still matter. Before using a figure in a proposal, replace this exercise with a site-specific model recording weather/location, orientation, tilt, shading, inverter sizing and losses. [S06]
What could the battery keep running?
For arithmetic only, assume 13.5 kWh usable, initially full; retain a 20% reserve and allow an illustrative 10% delivery loss: 13.5 × 0.80 × 0.90 = 9.72 kWh delivered. These are independent teaching assumptions, not product specifications. If the chosen product’s stated usable energy already includes conversion losses, do not subtract those losses again.
| Assumed average backed-up load | Illustrative operating time without solar recharge |
|---|---|
| 0.5 kW | 19.4 hours |
| 1.0 kW | 9.7 hours |
| 2.0 kW | 4.9 hours |
These are energy calculations, not runtime guarantees. Check battery/inverter continuous output, surge capability, initial charge, temperature and actual circuit behaviour separately. A 13.5 kWh battery does not automatically provide 13.5 kW. The equipment position needs a dimensioned layout based on the actual battery and applicable fire/building requirements; no universal wall clearance or footprint is assumed here.
What the cabling price should cover
Ask the installer to show routes on the coordinated plan and identify what the turnkey price includes. This is a quotation checklist, not a wiring instruction.
| Cable or electrical work | Scope to make visible in the quotation |
|---|---|
| Roof array connections | Module interconnections and the selected DC string/optimizer or AC microinverter arrangement |
| Route into the building | Measured route, suitable cable/conduit, penetrations, weather sealing and accessible support |
| Inverter to connection point | AC route, protection, disconnecting arrangement and service/panel compatibility |
| Grounding and bonding | Array, mounting and equipment requirements coordinated with the electrical design |
| Battery and backup | Approved interconnects, transfer/islanding controls and any essential-loads subpanel |
| Communications | Monitoring gateway, networking and owner access |
| Completion records | Circuit labels, as-built routes and commissioning documentation |
Do not select conductor sizes or breaker ratings from panel count alone. Route length, current, voltage, temperature, grouping, voltage drop and the chosen equipment all affect the design. Longer trenching, panel replacement or a service upgrade should be priced as explicit exceptions. Standard cabling must not be charged twice by adding a generic cable allowance to an already inclusive turnkey quote.
13. A transparent budget for the same example
USD, checked 19 October 2026; gross installed planning figures before incentives and financing. EnergySage’s October Virginia marketplace benchmark is about $2.55/W installed. Applying it to 9,000 W gives approximately $22,950; its own 9 kW table is about $22,930 because the displayed per-watt value is rounded. This is a market reference, not a Fairfax offer. [S10]
| Budget line | DLG example allowance | Requested scope |
|---|---|---|
| 9 kWp solar installation | $20,000–$27,000 | Panels, mounting, inverter, ordinary wiring/labour and permit administration; confirm actual fees and inclusions |
| 13.5 kWh-class storage addition | $13,000–$18,000 | Installed battery and agreed backup integration; check gateway/subpanel and inverter overlap |
| Combined planning total | $33,000–$45,000 | Sum of the two allowances, not a statistical confidence interval |
| Property-dependent work | Separate priced items | Roof renewal, structural repairs, service upgrade, exceptional trenching, relocation or special access |
The allowances are DLG editorial budgeting assumptions centred on marketplace references, not published local price ranges. EnergySage’s national battery benchmark is approximately $15,647 installed for 13.5 kWh, dated August 2026; it is not a Virginia-specific quotation. [S11] For a combined hybrid system, reconcile shared inverter, controls and labour so that adding two quotes does not duplicate equipment. Obtain comparable written scopes before treating the budget as project cost.
No automatic 30% federal homeowner discount has been deducted. IRS states that the Section 25D residential credit is unavailable for property placed in service after 31 December 2025. [S12] Check any current state, local or utility scheme separately; its availability is not assumed. Financing charges, ongoing servicing, insurance implications and future replacement costs are also outside the example. No payback period is calculated without the actual tariff, export treatment and operating assumptions.
14. Applications, documents and permission to operate
Fairfax County is distinct from the independent City of Fairfax. Confirm the parcel’s actual authority, building classification and utility before following this example. Apartment/condominium projects may use commercial rather than residential permit pathways. Ownership, condominium or HOA permissions must be checked against the specific property; owning a unit does not establish exclusive control of a shared roof.
County permit file: Fairfax residential solar
The county’s SOLARR page requires a residential solar permit for roof and freestanding residential arrays, applied for through PLUS. Related electrical equipment is entered in that record; extra work such as a service heavy-up can require a separate electrical record. [S13]
Prepare the following, with applicability confirmed for the project:
- Fairfax Coversheet and architectural/structural drawings.
- House location plat or grading-plan reference, as applicable.
- Permit Authorization when the applicant’s role requires it.
- Property Ownership Affidavit if ownership differs from tax records.
- License Exemption Affidavit if no licensed contractor is listed.
- Additional town approvals where applicable, including Clifton or Vienna.
The county can request corrections and supporting records. Approved plans/permit follow review and fee payment; required construction inspections follow installation stages. [S13] Have the designer establish how battery installation, fire review and any additional electrical work are covered; do not assume the array approval resolves every storage requirement.
Utility file: Dominion-served Virginia example
Keep the county application and utility connection application as two tracked workstreams. Dominion’s NMIN portal guide requests account/customer details, installation address, generator and inverter information, DC/AC capacity and whether battery backup is included. Vendor/customer signatures precede contingent approval. Following installation, the inspection/electrician record is submitted; meter work and billing setup precede the Permission to Operate (PTO) notice. Follow the actual approval conditions before construction and operation. [S14]
A practical owner handover folder
This is DLG’s recommended record set, not a claim that each item is a mandatory upload for every application:
| Record | Why retain it |
|---|---|
| Twelve-month bills and interval data | Explain the original sizing and future comparisons |
| Ownership/roof-use permission and contractor details | Establish authority, responsibilities and contacts |
| Approved layout, structural evidence, electrical single-line and equipment data | Identify what was approved and installed |
| Permit numbers, approved plans and final inspections | Track county completion |
| Signed utility application, connection conditions and PTO | Establish the permitted operating status |
| As-built drawings, commissioning and demonstrated backup scope | Explain actual operation and limitations |
| Warranties, monitoring credentials and maintenance contacts | Make the system usable and transferable with the property |
Physical installation, a passed county inspection and utility PTO are different milestones. Assign a named responsible party to each record and do not treat the installer saying “finished” as the operating permission.
Related topic: small wind on homes and other properties
Small wind deserves a separate assessment of wind at rotor height, surrounding obstacles, support structure, noise, setbacks, certified performance and maintenance. Start with the companion Small wind for homes and property guide; a roof that is suitable for solar is not automatically a useful wind site.
15. Solar Explorer: location, roof planes and time
Full preparation version 1.0 extends this guide with a working preliminary-assessment module. Choose a state and county/city, a ZIP/Census ZCTA reference or coordinates. Enter the panel rating/count, direction and tilt for one or two roof planes, then calculate the official model scenario.
The included geography contains 50 states, DC and Puerto Rico; 35,585 county/place entries; and 33,791 ZCTA points, from the 2026 Census Gazetteer. These representative points are not roof measurements or area-wide averages. Postal ZIPs and Census ZCTAs differ; an unmatched postal code needs a different location method. Actual climate-data coverage is checked by the model. [S15]
What the module shows
| Input or result | Available in version 1.0 | How to read it |
|---|---|---|
| Location | State/county/city, ZCTA or coordinates | The chosen point and weather cell remain visible |
| System | Panel W/count, true azimuth, tilt, roof/open-rack mounting, losses and DC/AC ratio | Editable planning inputs, not a selected installation design |
| Multiple roof faces | One or two independently modelled planes | Separate inverter allocations; not a shared-inverter/clipping design |
| Energy | Annual/monthly AC output and monthly-mean hourly power | Typical-year model, not live weather or a forecast |
| Sun path | Compass, hour markers, month/hour selection and geometric daylight | Approximate geometry for the 21st of the month, separately from TMY output |
| Orientation comparison | East/south/west for plane A, other inputs fixed | Plane B stays fixed when enabled |
| Household demand | Monthly average or twelve separate totals | Annual energy coverage is not simultaneous self-supply or a zero bill |
| Space | Module face area and an editable planning allowance | Real roof geometry, access and obstructions still need a layout |
| Battery | Selected-load energy/duration arithmetic | No battery dispatch or whole-home power guarantee |
| Cost | Entered installed solar/battery quotes and other works | No automatic local price, incentive or payback claim |
| Records | Scenario/result JSON, monthly CSV and print review | Retain the assumptions and source records with the comparison |
Actual model references are included
Twelve official model responses are retained for review, including the earlier three approximate urban points/directions, the Census Fairfax County starting point and two 4.5 kWp split-plane examples. The Fairfax County point at 38.82952, −77.27325, with 9 kWp, south 180°, tilt 30°, fixed roof, standard module, assumed losses 14%, DC/AC 1.2 and inverter efficiency 96%, returned approximately 12,362 kWh AC/year. [S15]
That differs from the earlier Fairfax-area point because the input point and climate cell differ. Neither is a prediction for every house in the county. The section 12 sensitivity table remains a separate hypothetical exercise. New system inputs request a fresh model; existing output is not scaled to pretend that a different roof/inverter has been simulated.
Evidence and operating scope
Model version, weather cell/file, climate vintage, standard time offset and input assumptions accompany each completed result. When inputs change, the previous production result remains explicitly identified until a new calculation succeeds. Coverage errors, quota limits, incomplete results and timeouts do not silently replace it with an invented estimate.
This tool includes cached reference models. New online scenarios use a public demonstration connection and depend on service availability. A dedicated server-side model connection is not configured. Reference examples are not live measurements or property-specific installation forecasts.
16. Follow one day through the system
Annual solar coverage hides an important buying decision: when must the house import power, and when does it export? A home can produce more than it consumes over a day and still buy electricity overnight. To see the mechanism, use the following deliberately fictional hourly example alongside—not in place of—the location-based Solar Explorer.
The input load totals 30.00 kWh; solar delivered to the AC comparison bus totals 33.40 kWh. For the battery we assume an internal 13.5 kWh energy store, a 20% minimum reserve, separate 95% charge and discharge efficiencies, and a 3 kW limit in each direction. It begins at reserve; grid charging is disabled. Each interval is one hour. These are teaching assumptions, not Powerwall specifications; the preceding product-class example and this internal energy model use different energy boundaries. Do not apply these efficiencies again to an already AC-delivered manufacturer capacity.
| Daily energy item | Solar without storage | Same fictional day with storage |
|---|---|---|
| Home consumption | 30.00 kWh | 30.00 kWh |
| Solar AC input | 33.40 kWh | 33.40 kWh |
| Solar used directly by the home | 11.23 kWh | 11.23 kWh |
| Grid imports | 18.77 kWh | 8.51 kWh |
| Grid exports | 22.17 kWh | 10.80 kWh |
| AC energy sent into charging | — | 11.37 kWh |
| AC energy returned from discharge | — | 10.26 kWh |
| Modelled battery conversion losses | — | 1.11 kWh |
| Internal energy, beginning / end | — | 2.70 / 2.70 kWh |
The balance closes: 33.40 solar + 8.51 imports = 30.00 load + 10.80 exports + 1.11 losses, subject to rounding. With initial and final stored energy equal, this example does not hide borrowing from a pre-filled battery. Grid imports remain because early demand arrives before the battery has charged and later demand can exhaust the usable window.
Keeping the same profiles and raising reserve to 50% increases imports to 12.36 kWh; reserving 100% leaves 18.77 kWh of imports because no energy is available for shifting. A larger emergency reserve can reduce daily shifting; the preferable balance depends on the owner’s outage objective and actual operating controls. This exercise excludes standby consumption, ageing, temperature effects, forecast dispatch and sub-hourly peaks. Do not multiply this day by 365, describe it as Fairfax weather or calculate a payback from it. The full package includes hourly CSV inputs/results, a reproducible calculation and boundary checks.
Turn energy flows into an honest bill comparison
For a simplified, explicitly hypothetical tariff, suppose imported energy costs $0.20/kWh and exported energy earns $0.05/kWh, without fixed charges or time bands. The example’s energy-only amount would be 18.77143 × $0.20 − 22.17143 × $0.05 = $2.65 without storage, and 8.51143 × $0.20 − 10.80301 × $0.05 = $1.16 with storage. The difference is approximately $1.48 for this invented day, calculated before rounding. This is arithmetic, not a real utility tariff or annual saving. Changing export compensation can substantially change the result; equal import/export rates can make battery losses costly. Demand charges, time-of-use periods, minimum bills, financing and battery wear require their own model.
17. Read an actual battery datasheet in layers
One reference—not a recommendation—is the U.S. Tesla Powerwall 3, model family 1707000-xx-y, 2025 datasheet retrieved 20 October 2026. Its table states 13.5 kWh AC nominal energy, with 5.8 / 7.6 / 10 / 11.5 kW nominal output configurations. The energy footnote specifies beginning of life, 25°C and 3.3 kW charging/discharging. Therefore “13.5 kWh” and “11.5 kW” answer different questions, and the quotation must identify the configured rating. The document lists integrated solar input and compatible islanding equipment; an energy expansion is not automatically extra inverter output. [S16]
For a separate, hypothetical load schedule, 3 kW of priority loads + 4 kW HVAC + 7 kW EV charging = 14 kW simultaneous demand. That exceeds an 11.5 kW comparison limit even if sufficient energy remains. Deferring the EV leaves 7 kW in this arithmetic, but motor starting, phases, actual backup rating, temperature and the approved configuration still need checking. Neither the sum nor a marketing phrase establishes that the selected home can be backed up.
AC coupling and DC coupling: compare the whole arrangement
| Quotation question | Separate PV inverter with AC-coupled storage | PV connected through a compatible hybrid arrangement |
|---|---|---|
| Existing equipment | Which existing PV equipment remains compatible? | Which existing equipment must be replaced or bypassed? |
| Conversion path | Identify PV DC→AC and battery charge/discharge conversion boundaries | Identify the shared conversion path and actual operating modes |
| Outage operation | Demonstrate that PV can operate with the selected islanding and battery controls | Demonstrate PV operation, restart and load behaviour for this exact configuration |
| Capacity constraint | Record separate inverter and interconnection limits | Record shared inverter/output constraints; do not add DC nameplate ratings as AC output |
| Cost comparison | Separate retained equipment, new storage, interface and commissioning | Separate integrated inverter functions from add-ons; avoid charging twice for the same function |
An architecture label alone does not establish compatibility or efficiency. Ask for the single-line diagram, equipment revision, proposed backed-up circuits, control sequence and manufacturer-supported configuration. Electrical design, protection, conductor sizing and installation require the actual site and applicable review.
18. Make the survey and handover useful to the next owner
Start with 12 months of bills plus interval data where available; note EV charging, HVAC electrification and occupancy changes rather than assuming today’s annual total will persist. Record roof age/remaining service considerations, roof faces and obstructions, structural review inputs, service-panel details, equipment locations, access routes and owner objectives. A roof replacement and a PV mounting plan must agree about penetrations, flashing, future removal and who covers each interface.
Keep three evidence folders separate: building approval, utility interconnection/permission to operate, and owner operating evidence. The existing Fairfax/Dominion example remains address- and provider-specific. A signed contract or passed building inspection is not the same evidence as permission for parallel grid operation. Use the dated authority and utility records already listed in section 14; other jurisdictions need their own file.
| Required quotation attachment | What a reader should be able to verify |
|---|---|
| Production model | Coordinates, weather data/model version, each roof plane, shading/loss treatment and AC/DC boundaries |
| Storage schedule | Nominal versus available energy, reserve, output configuration and priority load list |
| Work scope | Roof interfaces, routing, panel changes, interface equipment, restoration and explicitly excluded work |
| Commercial breakdown | Gross equipment/labour, permit/utility/structural allowances, financing separately, tax assumptions dated |
| Commissioning record | Meter direction, monitoring, approved backup demonstration, notifications and account ownership |
| Service terms | Labour versus product warranty, response scope, monitoring responsibility and removal/reinstallation terms |
An owner-facing acceptance file should include approved equipment identifiers/serials, the as-built diagram, authority/utility closeout records, settings and reserves, labelled circuit schedule, maintenance contacts and an explanation of what stops during an outage. Demonstrations must be performed through the installer’s approved procedures; the homeowner should not open electrical enclosures or simulate utility loss by improvised disconnection.
Tax freshness checkpoint, 20 October 2026: IRS currently states that the Residential Clean Energy Credit is unavailable for property placed in service after 31 December 2025. This package does not subtract an automatic 30% credit. Other programs, ownership structures and business tax treatment require their own current eligibility analysis. [S12]
Sources and scope
Checked 19 October 2026. Public sources provide system concepts; the mounting manufacturer describes its own products. The numerical home and budget are labelled teaching assumptions. Fairfax County and Dominion provide a local process example, not nationwide requirements. No exact structural design, conductor sizing or financial return is inferred. All imagery is illustrative.
S01 — US DOE: Consumer steps for going solar. Physical planning and responsibilities; historical incentive statements are not adopted.
S02 — US EIA: Energy storage for electricity generation. Power versus energy concepts only; old market statistics are not used.
S03 — US DOE: Solar energy and storage basics.
S04 — S-5!: PVKIT metal-roof mounting guidance. Load-path considerations for the named mounting context; no spacing or capacity copied into the concept detail.
S05 — US DOE: Inverters and grid services.
S06 — PVWatts: Calculator and cautions. Production estimates and modelling limits; section 12 is hypothetical, while section 15 links the implemented Solar Explorer and official model references.
S07 — US DOE: Solar and resilience basics.
S08 — US DOE: Homeowner’s guide to solar. Bill/ownership variables; no incentive figure adopted.
S09 — US DOE: Buying a house with solar. Documentation and ownership questions; no general property premium or lifespan forecast adopted.
S10 — EnergySage, Virginia: October 2026 installed solar cost benchmark. Marketplace data, not a project quotation.
S11 — EnergySage: Home battery guide, updated August 2026. National installed storage benchmark only.
S12 — IRS: Residential Clean Energy Credit. Post-2025 eligibility cutoff; checked 19 October 2026.
S13 — Fairfax County: Solar (SOLARR), residential permit. County pathway and conditional submission list, checked 19 October 2026.
S14 — Dominion Energy: Virginia net metering and self-service portal process guide. Applicant details, staged approval and PTO; actual service provider must be confirmed.
S15 — Model and location sources: PVWatts v8 API, Census 2026 Gazetteer, ZIP/ZCTA distinction, model service quotas and NOAA approximate geometry. Checked 19 October 2026; twelve official model responses, inputs, geography provenance and tests retained in DLG_Solar_Explorer_Full_v1.zip.
- S16 — Tesla: U.S. Powerwall 3 datasheet, 2025 edition, technical table p.2, checked 20 October 2026. Selected reference only; source values and toy-model assumptions are distinct. S12 IRS current page rechecked 20 October 2026.