DLG Insights · Blank planning worksheet · 19 October 2026 · Care-plan extension 28 October 2026
Use with the Landscape & Exterior guide. No property has been assessed or accepted through this blank template. Default status: OPEN / NOT TESTED. A named designer/authority determines applicable design, approval and acceptance requirements.
| Field | Entry / evidence / date |
|---|---|
| Property address, parcel and actual jurisdiction | OPEN |
| Owner / association authority | OPEN |
| Measured survey and levels; author / revision | OPEN |
| Boundaries, easements and receiving drainage rights | OPEN |
| Existing water observations, date / rain event | OPEN |
| Soil/infiltration/groundwater assessment | OPEN |
| Trees, wells, septic, protected resources | OPEN |
| Utility notification/response and private-line location | OPEN |
Repeat one row for each actual zone. Do not populate illustrative values as site measurements.
| Zone | Use / area / levels | Selected surface or planting | Water source / route / receiving point | Evidence and unresolved questions |
|---|---|---|---|---|
| OPEN | OPEN | OPEN | OPEN | OPEN |
| Input or output | Value / units | Source / method / date | Status |
|---|---|---|---|
| Horizontal contributing catchment | OPEN m² or ft² | Measured connected area | OPEN |
| Rainfall series and timestep | OPEN mm or inches | Station/grid, years, gaps | OPEN |
| Losses / first flush | OPEN | Define method; prevent double counting | OPEN |
| Nominal / usable storage; starting level | OPEN L or US gal | Selected equipment and operation | OPEN |
| Intended use and required quality | OPEN | Authority / health advice / design | OPEN |
| Net demand and delivery losses | OPEN | Seasonal zone assumptions | OPEN |
| Overflow / unmet demand by timestep | OPEN | Dated balance, not annual total alone | OPEN |
| Inlet, access, isolation, delivery and receiving route | OPEN | Coordinated design | OPEN |
Dimensional identity: mm × m² = L. A volume calculation does not size a pipe, pump or outlet, or establish water quality.
| Item | Authority / responsible person | Required evidence / plan revision | Hold point / status |
|---|---|---|---|
| Scope and permission determination | OPEN | OPEN | OPEN |
| Site / erosion / protected-resource review | OPEN | OPEN | OPEN |
| Structure / plumbing / electrical if applicable | OPEN | OPEN | OPEN |
| Buried services, levels and assembly before covering | OPEN | OPEN | NOT TESTED |
| Approved receiving / overflow route | OPEN | OPEN | NOT TESTED |
| Irrigation zones / controls / isolation | OPEN | OPEN | NOT TESTED |
| As-built evidence and open issue list | OPEN | OPEN | OPEN |
Only use the approved testing method. Record observations, limits, failed tests and corrective actions; do not mark a drawing as proof of a completed test.
| Scope | Quote / exclusion / recurring cost | Owner / due date | Evidence |
|---|---|---|---|
| Survey, design and approval | OPEN | OPEN | OPEN |
| Protection, access, preparation and spoil disposal | OPEN | OPEN | OPEN |
| Surface / drainage / tank / irrigation works | OPEN | OPEN | OPEN |
| Plant establishment and replacement terms | OPEN | OPEN | OPEN |
| Commissioning, reinstatement and closeout | OPEN | OPEN | OPEN |
| Seasonal care, filters/inlets, paving and equipment | OPEN | OPEN | OPEN |
| Manuals, warranties, accounts and support | OPEN | OPEN | OPEN |
Record account ownership and access transfer without passwords or recovery secrets. Acceptance date: OPEN. Accepted by: OPEN. Outstanding conditions: OPEN.
Complete one row per actual system. OPEN fields are questions, not accepted work. Obtain the applicable care documents and agreed responsibility before completing the schedule.
| System / exact product | Task and instruction / revision | Interval or event trigger | Responsible person / access | Completion evidence / next action |
|---|---|---|---|---|
| Timber / treatment / finish: OPEN | OPEN | OPEN | OPEN | OPEN |
| Composite / generation: OPEN | OPEN | OPEN | OPEN | OPEN |
| Concrete / finish / joints: OPEN | OPEN | OPEN | OPEN | OPEN |
| Permeable pavement / assembly: OPEN | OPEN | OPEN | OPEN | OPEN |
| Surface drainage / receiving route: OPEN | OPEN | OPEN | OPEN | OPEN |
| Tank / filters / pump if selected: OPEN | OPEN | OPEN | OPEN | OPEN |
| Outstanding item | Observation / evidence / date | Responsible person | Agreed next action / due date | Closure evidence / reviewer / date |
|---|---|---|---|---|
| OPEN | NOT TESTED | OPEN | OPEN | OPEN |
| OPEN | NOT TESTED | OPEN | OPEN | OPEN |
Keep maintenance observations separate from design or authority acceptance. An issue is not closed merely because a visit was booked. Record product warranty, workmanship terms, support contact and exclusions separately; no coverage is assumed by this template.