DLG / ATLANTA RENOVATION PREPARATION RECORD Editorial worksheet, 29 October 2026. Not a City application or official checklist. No completed entries are transmitted to DLG. Store your completed file yourself. Parcel/address: Relevant permitting authority and confirmation reference/date: Defined work and scope revision: Selected permit category (unconfirmed until checked): Current official checklist title, URL, revision/date: Submission channel confirmed by / date / reference: Express eligibility and channel (if proposed; not assumed): DOCUMENT REGISTER (repeat for each applicable document) Document name: Required / not applicable / not yet confirmed: Authority basis for that status: Preparer and responsible reviewer: File name and revision/date: Open question / next action / owner: Submission reference and date: Accepted or superseded by: CONDITIONAL REVIEWS Tree impact and pre-application meeting question: Zoning / historic / other review applicability: Confirmation reference, owner and next action: AFTER SUBMISSION Review comment / responsible person / reply and revision: Issued permit and accepted file-set reference: Inspection stages and booking responsibility: Inspection result / correction / closure evidence: Applicable completion or occupancy record: Do not mark an item complete solely because a file exists or an application was uploaded. Use the authority's actual instructions for the specific parcel and work. INSPECTION JOURNAL (repeat per applicable stage) Permit number and discipline: Required stage and authority basis: Work to remain accessible until review: Responsible contractor / booking party: Accepted inspection method confirmed by: Booking reference and date: Inspection result reference and date: Corrections / responsible party / due action: Reinspection or resolution evidence: Authority confirmation before covering, where applicable: Final or closeout evidence still outstanding: